TEXARKANA — The Texas Department of Transportation (TXDOT) continues its work widening of a bridge at Jennings Slough on U.S.-67 with signal lights controlling one-way traffic.
The widening of the bridge is one of three ongoing projects from the transportation department in Cass County.
There is also a road resurfacing and bridge rail improvements resulting in a southbound lane closure on U.S.-59 1.2 miles south of FM 2328 northbound to FM 2328 southbound.
At the Bowie-Cass County line on State Highway 8, the bridges over the Sulphur River are also being replaced.
In Bowie County, there are a total of six projects the transportation department is working on.
From FM 989 (Richmond Road, Texarkana) to the Arkansas state line there is reconstruction and widening of the highway with a concrete paving in the median.
From FM 989 to FM 3419 the frontage roads are being extended, and FM 2148 is closed under the I-30 bridge.
The westbound exit 207/Spur 594 on I-30 is having ramp rehabilitation with the exit and entrance ramps closed. Westbound traffic restricted to one lane.
From SH-8 on I-30 eastbound there are drainage upgrades and TXDOT has limited traffic to one lane in some areas.
The bridge over Anderson Creek on State Highway 98 is also being replaced. Traffic is restricted to one lane with signal lights controlling traffic through work zone.
Here are the rest of the road projects in the northeast Texas district:
Camp County
- SL 255 – From FM 1520 to US 271, constructing highway, County Road 2120 detoured
Harrison County
- US 59 – At I-20, replacing bridge. US 59 traffic shifted to southbound lanes
- I-20 – Concrete pavement repairs. Daytime lane closures
- I-20 – Bridge maintenance. Lane closures on north frontage road at Mason Creek
- I-20 – At Lansing Switch Road, constructing new bridge over interstate. Lansing Switch Road open to traffic
- SH 43 – At Kansas City Southern Railroad in Karnack, widening bridge over railroad. Signal lights controlling one-way traffic
- FM 3001 – At Little Cypress Bayou Relief. Replacing bridge. Temporary traffic signals in place, lane closure with two–way traffic
Panola County
- US 59 (Loop) – From Business 59 north of Carthage to US 79 east, rehabilitating highway. Roadways open, seal coat scheduled
- US 59 – From Harrison County line to US 79 north, installing safety barrier cable. Daily lane closures
- SH 149 – 0.8 miles south of SH 315 to US 59. Widening road
Titus County
- US 271 – At Dickson Creek, Big Slough Creek, White Oak Creek & White Oak Creek Relief, replacing bridges
Upshur County
- US 271 – From 5.9 miles north of SH 155 to 1.5 miles north of SH 155, resurfacing road. Lane, shoulder closures